《工程审定概算表.docx》由会员分享,可在线阅读,更多相关《工程审定概算表.docx(2页珍藏版)》请在第壹文秘上搜索。
1、工程名称:石嘴山高新区生态环境提升工程(初步设计)序号工程或项目名称工程量(m2)概算价值(万元)合计备注建知上费一工程费用58.29292.6212.32363.23一、贺兰山路两侧26.03147.08173.111土方工程26.0326.031.1机械清理渣土4398m36.606.601.2回填种植土5174m312.9412.941.3机械(人工配合)整理绿化用地21561ma6.496.492绿化种植工程147.08147.082.1桧柏球DBlm105株4.904.902.2云杉H云3m56株4.904.902.3樟子松H22.5m32株1.651.652.4国槐D28cm102
2、株6.086.082.5高接金叶榆D25cm68株1.831.832.6山杏D23cm1050株12.1112.112.7山桃D23cm560株6.466.462.8碧桃D25cm902株19.7619.762.9紫丁香12分枝以上182株1.101.102.10连翻12分枝以上68株0.410.412.11重瓣榆叶梅9-11分枝以上3452株18.5618.562.12金银木9-11分枝以上2350株12.5812.582.13侧柏绿篱3828ma56.5656.56二、规划一号路10.7249.034.3464.091土方工程8.578.571.1机械平整场地2702mi0.540.541
3、.2清理渣土1756m32.632.631.3回填种植土2162m35.405.402绿化种植工程49.0349.032.1白蜡D28cm127株6.486.482.2云杉H=3m86株7.407.402.3山杏D25cm28株0.390.392.4山桃D25cm83株1.151.152.5高接金叶榆D25cm255株6.856.852.6红玫瑰12分枝以上118株0.710.712.7紫丁香12分枝以上82株0.500.502.8金娃娃萱草2703m125.5525.553灌溉工程2.154.346.493.1机械挖、填沟槽土方850m31.191.193.2阀门检查井3座0.960.963
4、.3DelIOPVC管885m3.983.983.4De50PVC管30m0.070.073.5水表2个0.120.123.6DNUo涡轮蝶阀2个0.050.053.7DE50泄水球阀2个0.010.013.8DE50PVC球阀16个0.070.07工程名称:石嘴山高新区生态环境提升工程(初步设计)序工程或项目名称工程量概算价值(万元)合计备注号(m2)建三费艇娜3.9DE32PVC球阀16个0.040.04三、规划二号路20.6390.607.98119.211土方工程17.2017.201.1机械平整场地6253Hl31.251.251.2渣土外运3545m37.097.091.3回填种植
5、土3545m38.868.862绿化种植工程90.6090.602.1河北杨D26cm611株10.4910.492.2云杉H=3m151株12.9012.902.3红叶碧桃DN5cm48株0.770.772.4高接金叶榆D25cmIll株2.982.982.5DN5cm131株3.263.262.6连翘12分枝以上76株0.460.462.7榆叶梅12分枝以上82株0.620.622.8金娃娃萱草6253m259.1159.113灌溉工程3.437.9811.413.1机械挖、填沟槽土方1305m31.831.833.2阀门检查井4座1.601.603.3DeIloPE管1360m6.806
6、.803.4De50PE管125m0.250.253.5DNHO平焊法兰16个0.460.463.6DE50PE球阀30个0.150.153.7DeUo软密封阀8个0.320.32四、世纪大道补植0.915.916.821土方工程0.910.911.1机械平整场地2584m20.520.521.2换填种植土16m30.080.081.3树穴换土281m30.310.312绿化种植工程5.915.912.1国槐D28cm16株1.001.002.2刺槐D26cm265株4.284.282.3金叶榆55ml0.630.63二其它费用20.2120.211建设单位管理费1.0%002测量费0.5%1.821.823设计费(合同价)9.589.584工程监理费(市场价)4.984.985招投标服务费(市场价)1.761.766预算编制及审查费(市场价)2.072.07三预备费3%IL5011.50四合计58.29292.6212.3231.71394.94